Corrective Action

ID Action Number Title Action Description Action Type Priority
1 CA-2026-0181 Replace blocked crusher discharge spray nozzles an... Replace all six discharge nozzles, fit a header pr... ENGINEERING CRITICAL
2 CA-2026-0182 Add spray-nozzle condition to the weekly plant ins... A blocked nozzle is invisible until it is measured... ADMINISTRATIVE HIGH
3 CA-2026-0183 Align the chute-clearing and liner-support procedu... The procedure permitted a P2 disposable for tasks ... ADMINISTRATIVE HIGH
4 CA-2026-0184 Issue PAPR units to the crusher crew and complete ... Every crusher operator needs a current PAPR fit te... PPE HIGH
5 CA-2026-0191 Repair the workshop Bay 3 local exhaust ventilatio... Restore capture velocity to 0.5 m/s at the arc. Bl... ENGINEERING HIGH
6 CA-2026-0192 Restore 4 Level auxiliary duct integrity and re-su... Replace the patched duct section and re-survey qua... ENGINEERING HIGH
7 CA-2026-0193 Introduce a ventilation check before tasking an ad... Nothing currently stops a second diesel unit being... ADMINISTRATIVE MEDIUM
8 CA-2026-0194 Prepare the business case for Tier 4 underground f... The highest-order DPM control available. Ventilati... SUBSTITUTE MEDIUM
9 CA-2026-0121 Introduce a wind-direction tipping rule and vacuum... Restrict tipping in easterly conditions when the w... ADMINISTRATIVE MEDIUM
10 CA-2026-0185 Refresher training on RPE selection and care for t... The wrong respirator was worn because the selectio... TRAINING MEDIUM
of 2