Corrective Action
Records: 10
| ID | Action Number | Title | Action Description | Action Type | Priority |
|---|---|---|---|---|---|
| 1 | CA-2026-0181 | Replace blocked crusher discharge spray nozzles an... | Replace all six discharge nozzles, fit a header pr... | ENGINEERING | CRITICAL |
| 2 | CA-2026-0182 | Add spray-nozzle condition to the weekly plant ins... | A blocked nozzle is invisible until it is measured... | ADMINISTRATIVE | HIGH |
| 3 | CA-2026-0183 | Align the chute-clearing and liner-support procedu... | The procedure permitted a P2 disposable for tasks ... | ADMINISTRATIVE | HIGH |
| 4 | CA-2026-0184 | Issue PAPR units to the crusher crew and complete ... | Every crusher operator needs a current PAPR fit te... | PPE | HIGH |
| 5 | CA-2026-0191 | Repair the workshop Bay 3 local exhaust ventilatio... | Restore capture velocity to 0.5 m/s at the arc. Bl... | ENGINEERING | HIGH |
| 6 | CA-2026-0192 | Restore 4 Level auxiliary duct integrity and re-su... | Replace the patched duct section and re-survey qua... | ENGINEERING | HIGH |
| 7 | CA-2026-0193 | Introduce a ventilation check before tasking an ad... | Nothing currently stops a second diesel unit being... | ADMINISTRATIVE | MEDIUM |
| 8 | CA-2026-0194 | Prepare the business case for Tier 4 underground f... | The highest-order DPM control available. Ventilati... | SUBSTITUTE | MEDIUM |
| 9 | CA-2026-0121 | Introduce a wind-direction tipping rule and vacuum... | Restrict tipping in easterly conditions when the w... | ADMINISTRATIVE | MEDIUM |
| 10 | CA-2026-0185 | Refresher training on RPE selection and care for t... | The wrong respirator was worn because the selectio... | TRAINING | MEDIUM |