Sample Task Interval

ID Start Time End Time Task Code Task Description Controls In Use Notes Sample Operating Area Exposure Source
1 2026-05-12 06:05 2026-05-12 10:00 T-CR-01 Crusher operation and monitoring from the control ... CTL-002 pressurised control room; spray bars runni... Feed running normally for the first four hours. S-2026-0071 Primary Crusher Primary crusher discharge and chute
2 2026-05-12 10:00 2026-05-12 13:00 T-CR-03 Liner inspection support inside the crusher shell Spray bars isolated under permit; P2 disposable re... Highest intensity interval. The risk assessment cr... S-2026-0071 Primary Crusher Primary crusher discharge and chute
3 2026-05-12 15:30 2026-05-12 16:15 T-CR-02 Chute clearing after a wet-feed hang-up on restart Spray bars isolated during clearing; P2 disposable... Second clearing event. Discharge observed running ... S-2026-0071 Primary Crusher Primary crusher discharge and chute
4 2026-05-12 16:15 2026-05-12 17:55 T-CR-01 Crusher operation after restart Spray bars restored — but two of six nozzles found... Suppression only partially effective for this inte... S-2026-0071 Primary Crusher Primary crusher discharge and chute
5 2026-05-12 06:10 2026-05-12 15:30 T-CR-01 Control room operation CTL-002 pressurised control room - S-2026-0072 Primary Crusher Primary crusher discharge and chute
6 2026-05-12 15:30 2026-05-12 16:15 T-CR-02 Chute clearing assistance PAPR worn as required by CTL-003 Same task and interval as S-2026-0071, with the cr... S-2026-0072 Primary Crusher Primary crusher discharge and chute
7 2026-05-20 18:20 2026-05-20 23:00 T-UG-01 Face drilling on 4 Level Wet drilling (CTL-007); auxiliary ventilation Single loader in the heading for this interval. S-2026-0081 4 Level Stoping Area Jumbo development drilling
8 2026-05-20 23:00 2026-05-21 04:30 T-UG-01 Face drilling with a second loader mucking the sam... Auxiliary ventilation at reduced duty (patched duc... Fleet density doubled for this interval — the like... S-2026-0081 4 Level Stoping Area Underground diesel fleet exhaust
9 2026-05-21 04:30 2026-05-21 05:40 T-UG-03 Tramming out through the decline Primary ventilation only - S-2026-0081 Main Decline Underground diesel fleet exhaust
10 2026-06-03 07:00 2026-06-03 11:30 T-MT-01 Manual metal arc welding on a bucket repair Bay 3 LEV (degraded, 0.3 m/s); half-face P3 Capture velocity below the 0.5 m/s requirement for... S-2026-0091 Heavy Vehicle Workshop Workshop welding and grinding bay
of 2